返回
VAV 末端 · 2025/09/28

Part 30: VAV SYSTEM INSTALLATION AND CONFIGURATION

A comprehensive overview of the processes related to Starduct–Belimo VAV (Variable Air Volume) Boxes, including quality inspection and system integration.

翻译更新中

English version machine-translated from the Vietnamese original — under review.

The video provides a comprehensive overview of the processes related to Starduct–Belimo VAV (Variable Air Volume) Boxes, including quality inspection and system integration. One document details the Factory Acceptance Test (FAT) procedure for VAV boxes, ensuring they comply with AHRI standards and the approved technical specifications before leaving the factory. Another source is the user guide for the BELIMO ZoneEase™ VAV AP system, focusing on setting up the project in the Cloud, configuring actuators via an Excel template, and the on-site system checkout and commissioning procedure using the NFC mobile app. Finally, a handbook and checklist focus on troubleshooting and acceptance of the connection between VAV boxes and the Building Management System (BMS), in particular resolving communication conflicts (BACnet/Modbus) and override logic errors. The VAV controller option tables also describe various equipment configurations (actuators, sensors, control panels) based on airflow control or CO2 control applications.

Video

← 全部文章