The Hoa Phat Dung Quat 2 Iron and Steel Production Complex is a strategic industrial megaproject located in the Dung Quat Economic Zone, Quang Ngai Province, developed by Hoa Phat Group—Vietnam’s largest steel manufacturer.
Key Highlights:
- Total Investment: VND 85 trillion (approx. USD 3.5 billion)
- Site Area: 279 hectares
- Designed Capacity: 5.6 million tons/year
- 4.6 million tons of hot rolled coil (HRC)
- 1 million tons of special-grade steel
- Technology: European-standard continuous casting and rolling lines, ultra-large 2,500m³ blast furnaces (double the size of Dung Quat 1), and advanced environmental systems to reduce CO₂ emissions and energy consumption.
Construction & Execution:
- Construction began in Q1/2022, with Coteccons as the lead contractor applying fast-track methods to accelerate progress without compromising quality.
- Over 15,000 hours of safe construction have been logged, with more than 100 major components underway.
- Phase 1 is expected to be operational by early 2025, with full capacity reached by late 2025.
Economic & Social Impact:
- Will create approximately 13,600 jobs, with 80% local employment
- Aims to elevate Hoa Phat’s position as a leading steel producer in Southeast Asia
- Supports Vietnam’s industrial growth and self-sufficiency in high-quality steel for sectors like automotive, construction, and manufacturing.
NSCA’s Contribution:
Ngôi Sao Châu Á (STAR ASIA) is proud to supply Starduct-branded cable trays for this high-specification project, meeting the stringent quality and safety standards required for such a critical infrastructure development.

Related Project
Success
Add to cart successfully
Success
Logged in successfully
Fail
null
Fail
Please login to view details!
Success
Bình luận đã được gửi thành công và đang chờ duyệt!
Fail
Có lỗi xảy ra khi gửi bình luận. Vui lòng thử lại!