Back

Online factory audit

See how Starduct makes and controls each product: videos shot during real production shifts, stage by stage, each with a downloadable evidence card (machines and measuring equipment, procedures, ITP, sample QC records with client names masked, test reports). For owners, design consultants and contractors before material approval.

A0-1 Factory walkthrough 1 min 08 s

Factory exterior — from the gate to the production area

Details

Question answered: Where is the factory and what does the site look like from outside?

Real, unstaged footage shot on 29/10/2026: the gate, office block, car park, factory building, internal road between halls, cable ladders in the yard and the entrance to the production area. First episode of the topic-based factory audit series.

Evidence card

By factory

Walk through the factory in process order: incoming materials, fabrication, assembly, final inspection, test lab, traceability, packing.

A0-1 Factory walkthrough 1 min 08 s

Factory exterior — from the gate to the production area

Details

Question answered: Where is the factory and what does the site look like from outside?

Real, unstaged footage shot on 29/10/2026: the gate, office block, car park, factory building, internal road between halls, cable ladders in the yard and the entrance to the production area. First episode of the topic-based factory audit series.

Evidence card
A0-2 Factory walkthrough 0 min 56 s

Egg-crate panel workshop — exports to the USA

Details

Question answered: Can the factory mass-produce and export consistently?

Real footage shot on 29/10/2026: incoming coil stock, the coil-fed press line (JSD presses), press tooling and the egg-crate panel assembly area. Exported to the USA since 2020, 150,000–200,000 panels per year, export revenue of about USD 2 million; steady jobs for nearly 20 local women workers.

Evidence card
A0-4 Fabrication 1 min 18 s

CNC cutting and bending workshop

Details

Question answered: What equipment are the metal parts made on, and to what accuracy?

Real footage shot on 29/10/2026: QY Laser and LF-3015GAV fibre laser cutters, CNC press brake, and an enclosed CNC board-cutting room with dust extraction. This is where drive mechanism parts and precision components are made, to an accuracy of ±0.1 mm.

Evidence card
A0-5 Fabrication 1 min 08 s

Control damper workshop

Details

Question answered: On what lines are control dampers made, and at what capacity?

Real footage shot on 29/10/2026: spot welding of parts, control damper assembly benches, roll-forming lines, coil stock and decoilers. Two dedicated lines for two air control damper ranges: low-pressure, and airtight high-pressure tested to AMCA 500-D-18. Achievable output: hundreds of thousands of dampers per year.

Evidence card
A0-7 Fabrication 1 min 06 s

Powder coating line

Details

Question answered: How is the coating applied so that Starduct can give a 10-year colour-fastness warranty?

Real footage shot on 29/10/2026: the overhead conveyor, surface pre-treatment area and tanks, the powder spray booth and the line's control panel — the line that lets Starduct give a 10-year colour-fastness warranty.

Evidence card
A0-6 Assembly 1 min 17 s

EI fire damper workshop

Details

Question answered: How are Starduct EI fire dampers made, and in what volume?

Real footage shot on 29/10/2026: frame fabrication, damper body assembly, the assembly line, finished EI dampers, actuator fitting and stretch-wrapping. Workshop output is about 35,000–50,000 dampers per year, fire-resistance classes EI 30 to EI 180; size W unlimited, H ≤ 1,950 mm.

Evidence card
A0-9 Assembly 0 min 46 s

Air outlet workshop — domestic and export

Details

Question answered: Where are Starduct air outlets made, and which markets do they reach?

Real footage shot on 29/10/2026: the finished air outlet store, internal handling by trolley and reach truck, and the air outlet assembly benches. Products are supplied to projects in Vietnam and 12 countries worldwide, including the United States.

Evidence card
A0-11 Assembly 1 min 12 s

VAV box workshop

Details

Question answered: Where are Starduct VAV boxes made, and which ranges are produced?

Real footage shot on 29/10/2026: VAV box casings, the assembly line, sheet-metal equipment, boxing and forklift pallet handling. This is where the VAV single duct S-VAV-S (7 sizes, certified to AHRI 880) and the rectangular, fan-powered and reheat VAV ranges with electric heater or hot-water coil are made.

Evidence card
A0-10 Test laboratory 1 min 05 s

Quality control and in-house test lab

Details

Question answered: Where are products checked and set up before they go to site?

Real footage shot on 29/10/2026: the QC office, product sample shelves, the pre-dispatch checking area, the test rig and the in-house Product Testing Laboratory. Products are checked and set up here before they go to site, and new products are developed here before being sent to third-party laboratories.

Evidence card
A0-12 Test laboratory 0 min 56 s

Starduct R&D Centre

Details

Question answered: Where are Starduct products and technologies developed?

Real footage shot on 29/10/2026: R&D engineering workstations, the component and prototype bench, and a prototype with actuators and controllers. The R&D Centre is where all Starduct products, technologies, solutions, software and platforms begin.

Evidence card
P8 Third-party testing 2 min 17 s

Two-sided fire test of an insulated fire damper to EN 1366-2

Details

Question answered: Were tests really done, where, and for which models?

Single-blade insulated fire damper, 600 × 600 mm, spring-return actuator, fire-tested to EN 1366-2 at a laboratory designated by the Macau Fire Services Bureau. First side on 15/10/2026 (specimen XA52610194, actuator on the furnace side); second side on 22/10/2026 (specimen XA52610265, actuator on the unexposed side). Each test: 50 open/close cycles before the burn, then 180 minutes on the standard fire curve. Observed at the laboratory: insulation and leakage criteria met for 180 minutes on both sides. The official test report has not yet been issued and will be added when available.

Evidence card
A0-3 Packing and delivery 1 min 06 s

Goods-in and dispatch area

Details

Question answered: What loading and dispatch capacity does the factory have?

Real footage shot on 29/10/2026: finished goods area, packed goods awaiting dispatch, the covered goods-in and dispatch area and forklifts. 5–6 trucks can be loaded at the same time by overhead crane, forklift or loading dock, under cover or in the open; 5 dedicated forklifts with 1.5–7 t capacity.

Evidence card
A0-8 Packing and delivery 1 min 10 s

Packing for domestic delivery and export

Details

Question answered: How are goods packed before domestic delivery and export?

Real footage shot on 29/10/2026: the packing area, carton packing, the edge-seal shrink-wrap machine, packed goods and pallets ready for domestic delivery and export.

Evidence card
VAV-P10 Packing and delivery 1 min 19 s

Unit-by-unit run test, packing and dispatch of parallel fan-powered VAV

Details

Question answered: Is every parallel fan-powered VAV run-tested before it leaves the factory?

First dispatch for Parc Hanoi on 17/10/2026: 50 S-VAV-PFE parallel fan-powered VAV units with electric heaters. The HS500W fan speed controller (200–240 VAC) is switched on and off by the Belimo LMV-BAC, with maximum speed set on a 6-step knob; each unit is run-tested (fan and HS500W, electric heater, safety interlock) and set to Vmin/Vmax from the project schedule; VAV body and heater module are packed in separate cases; loading onto the truck.

Evidence card
VAV-P11 Packing and delivery 1 min 28 s

Parallel fan-powered VAV boxes with electric heater installed on site

Details

Question answered: What does a parallel fan-powered VAV box look like once installed, and what should the operation team watch for?

S-VAV-PFE boxes (parallel fan, electric heater) hung at an office project, October 2026: suspended on threaded rods below the concrete slab, connected to primary and supply ducts; access panel labels FAN ACCESS PANEL (fan chamber, filter) and PRIMARY AIR ACCESS PANEL (primary air damper); electrical warning label on the control box. Silent video. The box at 15–24 s has a ceiling bulkhead right below its access panels — an example of wrong installation; the other boxes have clear access.

Evidence card

Documents and actions

Download the supplier pre-qualification pack or book a factory audit visit.

Pre-qualification pack

Documents for supplier evaluation: management system certificates, ITP, control procedures, sample QC records and test reports by product line.

Document list being updated.

Book a factory audit

Send a request and our sales team will contact you to agree the date, hosts and what you want to see at the factory.

What you want to see

Your details are used only to arrange the visit.