0
Your cart0 Products
There are no products yet
Đại diện ngành sản xuất phụ kiện hệ thống MEP tại Việt Nam

Heavy industry

Vung Ang 2 Thermal Power Plant
undefined

Location

HÀ TĨNH- VIỆT NAM

Time

2021-2025

Type

Heavy industry

undefined

The Vung Ang 2 Thermal Power Plant is a major infrastructure project in Vietnam’s heavy industry sector, located in the Vung Ang Economic Zone, Ha Tinh Province. Developed under the BOT (Build-Operate-Transfer) model, the project is spearheaded by Vung Ang II Thermal Power Company Limited (VAPCO) with a total investment of USD 2.2 billion.

Key highlights:

  • Capacity: 2 generating units with a combined output of 1,330 MW
  • Technology: Ultra-supercritical coal-fired technology
  • Fuel Source: Imported coal from Australia and Indonesia
  • Timeline:
    • Unit 1 is expected to begin commercial operation in July 2025
    • Unit 2 is scheduled for November 2025

The project is being executed by a consortium of major contractors, including Doosan Heavy Industries, Samsung C&T, and Thai Binh Duong Group. Notably, Ngôi Sao Châu Á (STAR ASIA) is proud to supply key components such as air dampers, grilles, louvers, and cable trays under the Starduct brand.

Related Project

Success
Add to cart successfully
Success
Logged in successfully
Fail
null
Fail
Please login to view details!