Transport infrastructure · Hanoi · 2019
Hanoi Metro Line 3 (Nhon – Hanoi Station)
E/EI fire dampers and volume control dampers for the elevated and underground stations of a 12.5 km, 12-station metro line, meeting the main contractor’s French fire-safety requirements.
| Owner | Ban Quản lý đường sắt đô thị Hà Nội (MRB) |
|---|---|
| Location | Hanoi |
| Supply period | 2019 |
| Public | Consent given |
Supplied by Starduct
| Item | Period |
|---|---|
| EI fire dampers | 2019 |
| Control dampers | 2019 |
Photos
Reference documents
Confirmation letters, acceptance records and approved Submittals are provided on request and downloaded in the Partner Portal (logged). Where the owner does not consent, the project is shown without its name.
Sign in to Partner Portal