EI 120 Measured (test report)
S-MFSD-L600

Insulated fire damper L600 with Belimo actuator

One damper, one 58 mm insulated blade, 600 mm casing, installed in the wall between two fire compartments. Fail-safe closing on power loss, status via auxiliary switches.

Quick select Production & QC Catalogue DoP BIM
Insulated fire damper L600 with Belimo actuator

Technical description

Model codeS-MFSD-L600
TypeMFD · actuator
Fire classEI 120 (measured EI 120)
Production sizesW 150–1200 × H 150–800 mm
ReleaseFSLF24-S
Casing lengthL = 600 mm
Flange(W + 100) × (H + 100) mm · TDC-V40
Order codeS-MFSD-L600-1000x600-TDC-V40-EI120
Source: Measured (test report) · EI and leakage during the fire test: measured values from the test report. Free area ratio, ΔP, airflow and closed-damper leakage by size: calculated by the engine, outside the scope of the fire-resistance certification.

Testing

Test report064.22.KC.NCPCC
LaboratoryFire Safety Laboratory FSE (LAS-XD 416) – Vietnam Institute for Building Science and Technology (IBST)
Date2022-03-31
StandardISO 10294-1:1996 + TCVN 9311-1:2012
Specimen1200 × 800 mm
MeasuredEI 120 min · leakage during the fire test (test report §6.3)
Material testMgSO₄ board 10 mm (casing and blades): Mould resistance, ASTM D3273-21 — 28 days, 32.5 °C, 95 % RH
Exposed (smooth) face rating 10; inner (mesh) face, pressed against the steel, rating 9
Vietnam Institute for Building Materials (VIBM) – VILAS 003 · 5391/VLXD-TTMT&CKXD · 22/10/2026
Test outside the laboratory’s VILAS accreditation scope

Documents

BIM / CAD downloads

Direct download, no sign-in. To carry the performance of the selected size into your model, use the Quick selector.

Browse the full BIM library →

O&M manual · O&M training — EI fire dampers →

Production & QC

Process-stage videos

A0-6 Assembly 1 min 17 s

EI fire damper workshop

Details

Question answered: How are Starduct EI fire dampers made, and in what volume?

Evidence card
P8 Third-party testing 2 min 17 s

Two-sided fire test of an insulated fire damper to EN 1366-2

Details

Question answered: Were tests really done, where, and for which models?

Evidence card

Production & QC documents (ITP, procedures, sample records)

Document list being updated.

See the full factory audit

Quick select

Line quick selector with this model pre-selected. Project list, Submittal and DoP are printed from here. Open full screen ↗