Back
EI 120 Measured (test report)
S-MFSD-MB

Multi-blade fire damper EI120

Parallel multi-blade damper installed in the wall between two fire compartments, closing by spring return on power loss or fire alarm

Quick select Production & QC Catalogue DoP BIM
Multi-blade fire damper EI120

Technical description

Model codeS-MFSD-MB
TypeMFD · actuator
Fire classEI 120 (measured EI 123)
Production sizesW 150–800 × H 150–1200 mm
ReleaseBFN24-SR
Casing lengthL = 210 mm
Flange(W + 65) × (H + 65) mm · TDC
Order codeS-MFSD-MB-800x1200-TDC-EI120
Source: Measured (test report) · EI and leakage during the fire test: measured values from the test report. Free area ratio, ΔP, airflow and closed-damper leakage by size: calculated by the engine, outside the scope of the fire-resistance certification.

Testing

Test report0838-2025/TNCL-TT1
LaboratoryVLAT-2.0552 – Centre for Applied Research of Fire Science & Technology, University of Fire Prevention and Fighting
Date2025-12-12
StandardISO 21925-1:2018 + TCVN 9311-1:2024
Specimen800 × 1200 mm
MeasuredEI 123 min · leakage during the fire test (test report §6.3)
Material testMgSO₄ board 10 mm (casing and blades): Mould resistance, ASTM D3273-21 — 28 days, 32.5 °C, 95 % RH
Exposed (smooth) face rating 10; inner (mesh) face, pressed against the steel, rating 9
Vietnam Institute for Building Materials (VIBM) – VILAS 003 · 5391/VLXD-TTMT&CKXD · 22/10/2026
Test outside the laboratory’s VILAS accreditation scope

Documents

BIM / CAD downloads

Current family release (legacy code) — new-code version being updated. Direct download, no sign-in. To carry the performance of the selected size into your model, use the Quick selector.

Browse the full BIM library →

O&M manual · O&M training — EI fire dampers →

Production & QC

Process-stage videos

A0-6 Assembly 1 min 17 s

EI fire damper workshop

Details

Question answered: How are Starduct EI fire dampers made, and in what volume?

Evidence card
P8 Third-party testing 2 min 17 s

Two-sided fire test of an insulated fire damper to EN 1366-2

Details

Question answered: Were tests really done, where, and for which models?

Evidence card

Production & QC documents (ITP, procedures, sample records)

Document list being updated.

See the full factory audit

Quick select

Line quick selector with this model pre-selected. Project list, Submittal and DoP are printed from here. Open full screen ↗